Chapter 15 Firewall
Started 02/05/2011 finished xx/xx/xxxx Hours worked this
chapter :03
These picture are the build of the firewall and canopy
covered in Chap-18.
This
picture shows the bid tap the goes on the firewall into the inside and on
top of the main spar. then a second lay up goes on the outside of the
firewall and the main spare flox is added to fill in the spar firewall jog.
Here
it is after cure and the peel ply is removed, notice I left space for the
two plywood pulley mounts that are used for the rudder cables later on.
Mounting
the top half of the firewall
Here
you can see the clark foam used to build up to the same level plane as the
firewall plywood top and bottom. Once cured I was able to sand the foam
level at all points.
Inside
looking at the firewall floxed in place
The Chap-15 firewall build is coming soon. The above
pictures are part of the Canopy build that included the plywood firewall
segments and main spar.
|