« on: November 05, 2007, 10:45:16 AM »
Need some opinions. I have read that epoxy temps should be maintained 65 degrees or above for several hours after a layup. I have done all my structural layups with temps in the 80 degree range. My question is about the micro fill (non structural) stage only. Will temps in the 45-50 degree range effect the quality of the micro fill? I have placed excess micro in the freezer to slow the cure and used it a day or two later. If I did not use it for several days it cured even though it was still in the freezer. Just wondering if I have to fire up the heaters to do a micro fill only.
David