Chapter 10 Building Log

I went ahead and ordered my canard cores from Eureka as the cost of the raw material is so high that the cost differential is pretty low. So this is saving me some time without much additional cash. I have not pulled them out of their box yet, but I dont want to mess with them until I am ready to start working on the canard.

 

9/29/11 - Spent the last few days cleaning up the shop and building a 12' long work table on top of my work benches for the canard construction. I spent lots of time trying to get it perfect, but I never quite got there, so I settled for almost perfect.