Chapter 5 Chapter 5 is dedicated to assembling the fuselage sides.

The major steps include:

Significant problems that I encountered include:

Assembling the jigs. I screwed them onto the table to make them as rigid as possible when I ultimately clamped them during the gluing process.
Clamping everything up. I guess clamps are like money, you can never have enough.
Weighing down the doublers.
I sliced all the foam angles with the band saw. Worked pretty well but I had to make a special jig to hold the foam to the correct angle. Cutting out the "holes" for the hand cutouts was done with a circular piece of sandpaper attached to a round sounding board.